Expansion of a deep-freeze warehouse, washing bay, testing of quality assurance in office spaces

Client: Dr. Oetker Tiefkühlprodukte GmbH Wittenburg
Place: Wittenburg
Construction period: 2013
Services: Planning and construction supervision as general planner (HOAI service phases 1-8), (object planning), project management

Short description:
In this solution, a wide range of measures was prepared in the existing building during the operation. For example, in an existing deep-freeze storage room offices and quality assurance infrastructure were installed in compliance with a high level of fire protection standards. A previous warehouse building was completely rearranged as a wash-house for production facilities, and the connection was ensured by a new passage. Also, a new deep-freeze storage facility was re-edified.

<- back to project selection