New construction of a transport bridge

Client: J.J. Darboven GmbH & Co. KG
Place: Hamburg
Construction period: 2015
Services: Planning and construction supervision as general planner (HOAI service phases 1-9)

Short description:
For the connection of a production plant to neighboring picking areas and warehouses, a transport bridge with a conveyor belt was designed and erected. The steel structure was delivered and installed. This required various reconstruction measures.

<- back to project selection