Expansion of a refrigeration plant

Client: apetito AG
Place: Rheine
Construction period: 2013
Services: Planning and construction supervision as general planner (HOAI service phases 1-8) (object, technical building equipment, electrical, refrigeration, outdoor planning), project management

Short description:
The existing capacity of the NH3 refrigeration system was no longer sufficient to supply additional production facilities. A new building with a direct connection to the existing building was built with the aim of integration. In the process, the NH3 refrigeration plant was refurbished. The approval phase was successful according to BImSchG (Federal Pollution Control Act).

<- back to project selection